• @[email protected]
    link
    fedilink
    English
    291 year ago

    It is also way easier to install a charging station than a gas station.

    Electricity is already available everywhere.

    • @[email protected]
      link
      fedilink
      English
      221 year ago

      Installing wires is too difficult. Let’s just continue doing it the easy way, pumping liquid dinosaurs out of the ground and transporting flammable liquid thousands of miles.

      • @[email protected]
        link
        fedilink
        English
        91 year ago

        Gasoline has about a 6 month self life and has to be refined from crude oil at specific facilities that polute the surrounding area.

        The supply chain to support gasoline is completely insane compared to plugging you car in at home 90% of the time. Once the wiring is updated to support EVs it’s basically done, no more logistics expense but gas is expensive always.

          • @[email protected]
            link
            fedilink
            English
            31 year ago

            My apologies I was meaning to share frustration because I agree with you not come off as an argument. I hope you don’t feel as if I was saying you were wrong.

            It’s also madness because we did this before at least in the US with air conditioning going main stream on a grid designed to support lights only.